| Home Current Projects List
 
 
 Oceans 2.0
 Project Overview
 Detailed Description
 Principal Researchers
 Project Deliverables & Milestones
 Technology Demonstrations
 Press Coverage
 Publications,
            Reports & Presentations
 
 |   | 
           Project web site established.  Project staff hired.  Preliminary camera re-assembly.Selection of compression/IP board. Evaluation of existing software. 
          Order and reception of compression/IP board. Integration of HDTV camera hardware with all new components and bench tests. Dry test and integration of camera hardware with software.  Preparation for deployment.    Test of existing software using camera in an “re-assembly” state. Design of middleware and coding completed. Design of web-based camera control interface and coding 
using Web 2.0 environment
completed. Test software command chain with hardware. Setup camera display and control system at the Vancouver Aquarium. 
          Train Vancouver Aquarium staff in the use of the system. Press event. Access and search a repository of underwater video recordings (interoperability implementation). Design video annotation system to be integrated with the DMAS system. 
          Implement/integrate or adapt existing video annotation system. Test existing automated feature detection in recorded video. Workshop on underwater cameras. |  |